BCKPC BCKPC - Architects & Engineers - Projects for Bid - Projects For Bid

Projects For Bid

View the current projects for bid

Mayfield CSD - 2016 Capital Improvements - Ph. 3 (Rebid)

Description:

General Construction work at the Elementary School including renovation of corridors, complete renovation of 4 toilet rooms, renovation of the main office to create secure vestibule, renovations to the cafeteria, and exterior door replacement.  Work at the High School including complete renovation of existing library and guidance to create new office suite and library, renovation of district office to create secure vestibule, select classroom renovations, electronic messaging sign and base, and District Office entrance.

Plumbing work including demolition and new  work for plumbing systems at the High School and Elementary School.

Theatrical Construction including replacing existing theatrical systems and lighting for the auditorium, new audio/visual systems at the High School library, new sound system at the High School gymnasium, new sound system at the Elementary School cafeteria, new sound system at the Elementary School gymnasium, and new athletic field sound system.

Estimated Construction Budget:

Budget will be forthcoming.

Pre-Bid Meeting:

Pre-Bid Meeting will be held at the Mayfield CSD High School Auditorium at 2:30 p.m., October 25, 2017.  Project sites will be available for bidders to inspect proposed work areas from 9:00 a.m. to 3:00 p.m. on weekdays by appointment with Mr. Benn DeRocker, C&S Companies, phone no. (315) 264-2227.

Bid Opening:

Bids are due at the Mayfield District Office, 27 School Street, Mayfield NY  12117 until  2:30 p.m. on November 15, 2017, at which time the bids will be opened and publicly read aloud in the High School Auditorium.

Project Schedule:

Start:  Ten (10) working days after receipt of a "Notice to Proceed".

Completion:  August 24, 2018

Cost Per Set:

$50.00 (non-refundable)

Architect/Engineer:

BCK-IBI Group
41 Chenango Street
Bingahmton, NY 13901
Phone: 607.772.0007
E-mail: bn_info@ibigroup.com

Additional Details:

  • Bonding: Yes
  • Tax Exempt: Yes
  • Wage Rates: Yes

Obtain Documents

Maine Endwell CSD - Smart Schools Project

Description:

Communications cabling upgrades and additions at High School, Middle School, Maine Memorial Elementary and Homer Brink Elementary Schools.  Installation of racks, fiber optic cables, copper cable, supports and data jack and patch cabling and assemblies.

Demolition of existing rack, fiber optic cables copper cables and surface raceways at each of the School Buildings.

Estimated Construction Budget:

Electrical Construction:  $400,000

Pre-Bid Meeting:

Pre-Bid Meeting will be held at the High School Staff Development Room at 9:00 a.m.,October 24, 2017.  Project sites will be available for bidders to inspect proposed work areas from 9:00 a.m. to 3:00 p.m. on weekdays by appointment with Mr. Jeffrey L'Amoreaux, phone number (607) 754-1400.

Bid Opening:

Bids are due on November 2, 2017 at 3:00 p.m. at the High School Staff Development Room.

Project Schedule:

Start:  Ten (10) working days after receipt of "Notice to Proceed".

Completion:  February 16, 2018.  All work to be performed on second shift.  Prior to starting any work, Contractor to meet with Owner to determine  required sequencing of buildings.

Cost Per Set:

$25.00 (non-refundable)

Architect/Engineer:

BCK-IBI Group
41 Chenango Street
Bingahmton, NY 13901
Phone: 607.772.0007
E-mail: bn_info@ibigroup.com

Additional Details:

  • Bonding: Yes
  • Tax Exempt: Yes
  • Wage Rates: Yes

Obtain Documents